Click Inspection Start a subscription
  1. Home
  2. Time saved

Time saved, worked out

Level 3 done in under an hour. Level 4 in an afternoon, not a day.

The walk-round takes as long as the building takes. What Click Inspection removes is everything after it: retyping plates, transcribing notes, filing photographs, building the asset list, writing the report and fixing the XML. Here is that time, task by task, for a Level 3 and a Level 4 inspection.

Level 3 inspection

A representative job of simple systems: splits and packaged units.

Typical form-based software2 h 53 min
Click Inspection52 min

2 h 1 min70% less time recording and writing up

Level 4 inspection

A representative job of complex systems: central plant, AHUs, an itemised asset list.

Typical form-based software7 h 46 min
Click Inspection2 h 1 min

5 h 45 min74% less time recording and writing up

An estimate from the assumptions set out below, not a measurement of anyone’s day. Travel, access, the walk-round itself and lodgement are the same either way and are not counted. Change any figure to match how you work.

Work it out for your own jobs.

Pick a level, say what is on the job and how many you do a month. Every figure on this page follows.

The assumptions, every one.

Minutes per task. “Typical” is a form-based workflow: notes and photographs on site, then typing it all into desktop software. The representative jobs are 4 outdoor and 6 indoor units with 2 controllers at Level 3, and 6 outdoor units, 24 indoor units, 2 air handling systems and 4 controllers at Level 4.

TaskTypical, minutes (L3 / L4)Click Inspection, minutes (L3 / L4)
Setting up the job and the pre-site recordper inspection15 / 20Typed into the software from the booking and your notes.10 / 15Set up once in the dashboard and synced to the phone; the pre-site checklist is ticked as you go.
Data plates: make, model, serial, capacity, refrigerantper unit4Photographed or written down on site, then typed in at the desk.1Photographed and read on the phone, checked against the system database; you confirm it.
Condition questionsper unit3Noted on site, then entered question by question.1Answered from the condition photograph; All as expected for what a photograph cannot see.
Controller readings and controls questionsper controller4Mode, setpoint and time schedules written down, then entered.2Mode and setpoint read off the controller’s display; you confirm the rest.
Filing evidence photographs against each unitper unit1.5Renamed and sorted into folders after the visit.0Filed against the unit as each one is taken.
The asset listper unit0.5 / 1.5Compiled into a spreadsheet; at Level 4, every indoor and outdoor unit itemised with its serial.0Generated from the survey, on every plan.
Executive summary and recommendationsper inspection45 / 90Written up from your notes.15 / 30Drafted from the survey; you read, reword and accept each section.
Creating and checking the XMLper inspection15 / 20Exported at the desk; errors found and fixed when it is uploaded.3 / 4Written on the phone and checked against every safeguard before it is saved.

What this does not count

  • Travel, access and the walk-round itself. The building takes as long as it takes.
  • Lodgement: uploading the XML into Sterling E-Volve Projects is the same step either way.
  • The review you still do. Every answer the app fills in and every section it drafts is yours to check, and the Click Inspection figures include that time.

Finish the inspection documentation before you leave the car park.